Why the lowest quote ends up costing more

The lowest quote is often the most incomplete one. Extra work later, low-quality materials and work done twice soon close the gap.

When comparing quotes, ask these 7 questions: scope, materials, strip-out/debris, schedule, responsibility, warranty and payment plan.

We deliver quality work at a fair price: a quote with every item written out, no surprises. Contact us for a free site survey.

  1. 01

    Is the scope the same?

    Before comparing quotes, make sure they cover the same work. A missing item comes back later as “extra work”.

  2. 02

    Are materials specified?

    Not “tiles” but brand, series, size. Not “paint” but product and number of coats. Vague materials mean the lowest quality arrives.

  3. 03

    Who handles strip-out and debris?

    Strip-out, debris removal, protection and cleaning are often missing from quotes, but they always have to be done.

  4. 04

    Duration and schedule

    When will it start and finish? For a shop, every week of delay means lost rent and turnover.

  5. 05

    Who is responsible?

    Is your architecture firm responsible for organising, building and supervising? Or are you chasing separate makers for every single item yourself?

  6. 06

    Warranty and service

    Who will you call if a problem appears after completion? A written warranty and a reachable contact matter as much as price.

  7. 07

    Payment plan

    A payment plan tied to progress is healthy for both sides. Stay away from quotes that ask for everything up front.

KA Mimarlık · Published:

Why the lowest quote ends up costing moreWhy the lowest quote ends up costing more — Is the scope the same?Why the lowest quote ends up costing more — Are materials specified?Why the lowest quote ends up costing more — Who handles strip-out and debris?Why the lowest quote ends up costing more — Duration and scheduleWhy the lowest quote ends up costing more — Who is responsible?Why the lowest quote ends up costing more — Warranty and serviceWhy the lowest quote ends up costing more — Payment planWhy the lowest quote ends up costing more — KA Mimarlık

More tips

Готовы к вашему следующему проекту.

Свяжитесь с нами для замера и расчёта — от замера до монтажа всё сделаем мы.

Наши клиенты

41+ →
  • Galatasaray
  • İş Bankası
  • Rönesans İnşaat
  • Saruhan Holding
  • Bezmialem Üniversitesi Hastanesi
  • Samsonite
  • TUMI
  • Yargıcı
  • DESA
  • De'Longhi Cafe
  • KAAVE
  • Bronco Burger
  • İsmet Saz
  • Tekser Teknik Seramik
  • Storymaker
  • Son Ateş Ocakbaşı
  • Serin Esinti Derneği
  • Hava Harp Okulu
  • Schneider Electric
  • Garanti Factoring
  • Craft Tiyatro
  • Craft Oyunculuk Atölyesi
  • TCDD
  • Ayşe Teyze Bağ Bahçe
  • Basicon
  • CBA
  • Central Hospital
  • Dagi
  • Danone
  • Domino's Pizza
  • Favori Altın
  • İder
  • Jetcopy
  • Loder Lojistik Derneği
  • Sampi
  • Samsung
  • Seviye Dershaneleri
  • Ekip Akademi
  • GSStore
  • Serotonin Akademi
  • Serotonin Pilates