Home renovation in the right order: what comes first?
When renovation work happens in the wrong order, the same job gets done twice: a freshly painted wall is cut open for cables, new flooring arrives with paint stains.
The general order: strip-out → services → plaster/screed/waterproofing → tiling and ceilings → kitchen, wardrobes, doors → final coat of paint.
With one team and one point of contact, you don't have to manage this order yourself.
- 01
Strip-out and rough work
Demolition, wall changes and debris. Structural elements (columns, beams, shear walls) are never touched.
- 02
Services
Electrics, water, drainage, gas and AC pipes go in before walls are closed. Socket and light positions follow the furniture plan.
- 03
Plaster, screed, waterproofing
Walls are levelled, wet areas waterproofed and the floor screeded. The screed is given time to dry.
- 04
Tiling and ceilings
Bathroom and kitchen tiling, suspended ceilings and plasterwork. Then the first coat (primer).
- 05
Kitchen, wardrobes, doors
Measurements are taken from finished walls, then furniture is made. Flooring goes in last, before painting or protected.
- 06
Final coat and cleaning
Final coat of paint, fittings and socket covers, silicone and detailed cleaning. The home is ready to hand over.